main-image1
main-image-frame

PROJECT FEATURES

Aesthetics

Design conecpt is inspired from contemporary popular Nepali style with minimalist approach of design. Building also reflects modern day Nepali building with international aspiration. Aesthetic compositions of building facade is in simple volume composition with possibily unproblematic building matrerials.

Functions

The independent housing unit consists of about 761.45 sq. ft. plinth area with living, dining, kitchen, store and service rooms in ground floor along with a car porch and small garden at the front. First floor consistes of three bed rooms along with a family lounge, second floor consists of multipurpose room, small area for puja and usable terrace.

Certain proficient Nepali Vaastu values are applied in each building consulting vaastu experts by the developers.

Sewerage System

The septic tanks and soak pits of adequate capacity have been proposed as a part of sewerage system of the project. Since large number of people has to be accommodated, the cleaning period of the tank shall be managed properly. The RCC pipes of adequate capacity shall be installed as per the drawing as a means to convey generated sewer. These RCC pipes shall be laid below the water supply system.

Strength

Building structure is based on RCC design with safe and sound seismic consideration with up to date Nepali building construction practice standards.

Drainage System

The proper drainage system for storm water and sullage from kitchen has been proposed for the project. RCC pipes of adequate diameter shall be installed as per the drawing. The final out-let of the storm water shall be from the underground drain pipe system to city sewer system. The mainholes shall be placed at every bends and at proper distance of the drainage system.

Solid waste management

The proper solid waste management system has been proposed for the project. The collection units shall be installed at appropriate location so as to collect the generated waste. The dwellers will be informed about the municipal waste collection system in an attempt to dispose the waste properly and create the clean and healthy environment.

Water supply system

Two means of water supply shall be proposed for the project. One from Nepal water supply corporation distribution line and another from project's own deep tube well. The water tank of 1,00,000.00 liters has been proposed to cater the need of people of population of 250. The overhead water tank of adequate capacity shall be installed fro the continious water supply of water in each unit.

Security System

A guard room has been provided at the main entrance gate. The whold area of the housing complex shall be fenced by the brice wall. Round the couck security system shall be provided and shift will be changed after every eight hours.

Electricity and telephone

The project shall be facilitated with the three phased electicity line. Besides generators shall also be installed an alternative means only for emergency cases. The point for the telephone facility shall also be provided for each and every building.